Choctaw Construction Services, LLC. is a Houston area-based railroad services contractor, our approach is to provide safe, reliable and quality oriented services for railroad industries. Choctaw Construction Service's fleet of equipment is designed to perform all the various services that are crucial for the project at hand.
Much of our equipment falls in the category of standard heavy pieces used for multiple types of work. However, some projects require highly specialized equipment, engineered to perform very specific tasks. Our fleet includes an assortment of these specialized pieces of equipment, allowing us to perform even the most unique contractor services.
With questions or for additional information, please contact us today.
CenterPoint Energy Pledger Substation Project - Van Vleck, TX
- November 2022
- Cleaning and grubbing of 10.5 acres
- Excavation and embankment of 38,000 cubic yards
- Installed 28,000 square yards of lime stabilization
- Installed 16,000 tons of cement treated limestone base
- Installed 2100 LF of storm water drainage
Union Pacific Railroad Track Raise Project - Navasota, TX
- October 2022
- Provided access for bridge installation
- Excavation and embankment of 21,000 cubic yards
- Installed 9500 tons of limestone base
- Installed 5500 tons of granite ballast
- Removed 2100 ft of track panels
- Placed 51 40 ft. track panels
- All work performed within a 30-hour work window
Kansas City Southern Railroad TELFNER Siding Project - Victoria, TX
- September 2022
- Clearing and grubbing over 20 acres
- Excavation and embankment of 10,800 cubic yards
- Installed 48,000 sq. yards of soil cement stabilization
- Placed 24,000 tons of limestone base
- Installed 14,000 track feet of new track construction
- Built and installed 2 #20 turnouts
Kansas City Southern Railroad Siding Project - Wharton, TX
- September 2022
- Clearing and grubbing of 19 acres
- Excavation and embankment of 65,000 cubic yards
- Installed 72,000 sq yards of lime stabilization
- Installed 24,000 tons of limestone base
- Installed 13,200 track feet of new track construction
- Built and installed 2 #20 turnouts
- Provided and placed 15,000 tons of granite ballast
CenterPoint Energy Hillje Substation - El Campo, TX
- August 2022
- Clearing and grubbing 25 acres
- Excavation and embankment of 110,000 cubic yards of soil
- Installed 72,600 sq yards of lime stabilization
- Placement of 55,000 tons of limestone base
City of Pine Island Emergency Culvert Replacement - Pine Island, TX
- August 2022
- Replaced 4 60” culverts for failing bridge replacement
- Provided design and traffic control
- Completed within 1 week of NTP
VA Cemetery Concrete Paving & Structures Project - Houston, TX
- June 2022
- Installed 110,000 sq ft of concrete structures
- Installed 75,000 sq ft of concrete paving
- Installed 11,000 LF of sidewalk and ADA ramps
- Grading and lime stabilization for entire project
Union Pacific Railroad Vanderbilt Siding Project - March 2022
- March 2022
- More details coming soon
Union Pacific Railroad Liverpool Siding Project - Liverpool, TX
- February 2022
- More details coming soon
CenterPoint Energy Mykawa Substation - Houston, TX
- October 2021
- Clearing and grubbing 35 acres
- Excavation and embankment of 115,000 cubic yards of soil
- Installed over 4500 ft of storm drainage utilities
- Installed 84,000 sq yards of lime stabilization
- Installed 80,000 sq yards of cement treated limestone base
- Installed 35,000 sq feet of concrete pilot channel
- Installed 16,000 tons of Grade 1 Rip Rap
Alleyton Resources Rosenberg Rail Terminal - Rosenberg, TX
- May 2021
- Clearing and grubbing of 150 acres
- Excavation and embankment of 145,000 cubic yards of soil
- Soil cement stabilization of 68,000 sq yards
- Installed 2000 ft of storm drainage utilities
- Placement of 35,000 tons of limestone base material
- Installed 9800 track feet of new track construction
CenterPoint Energy Brazos Valley Jones Creek Project - Freeport, TX
- March 2021
- West Colombia to Freeport, TX
- Installed over 500 access points, culverts, and driveways
- Built over 40 acres of material lay down yards
- Built 30 miles of access road
- Installed over 50 creek and low water crossings
- Restoration and cleanup of 60 miles of ROW
Union Pacific Railroad Master Retarder Replacement - Houston, TX
- December 2020
- Englewood Yard, Houston
- Removal and replacement of 283,000-pound, 250 ft master retarder
- Provided survey design and engineering for project
- Project completed within 8 hours
- Review additional details in UPRR’s Teamwork Pulls Off Epic Union Pacific Englewood Yard Project
Union Pacific Railroad Double Crossover Installation - Houston, TX
- November 2020
- Settegast Yard, Houston
- Provided 19 CAT 336 Excavators
- Installed 2 #15 double crossovers with buffer panels, as one piece
- Utilized GPS machine control equipment for precision grading
- Completed install within 10-hour window
Union Pacific Hurricane Laura Recovery
- August 2020
- Pre-storm staging of teams and resources at key locations
- Post storm dispatched over 200 field personnel and supervisors, along with 150 units of equipment
- Removal of debris, clearing ROW, set up of griding yards in multiple locations for debris
- Provided man camp and catering services for up to 300 people
UPRR Hacienda Siding Project Uvalde, TX Del Rio Sub
- Feb 2020
- Clearing and Grubbing of 35 Acres
- Excavation of 22,000 cubic yards of soil
- Placement of 80,000 tons of Limestone Base Material
- Construction of 2 Precast Bridges
- Construction of 3 Grade Crossings
- Construction of 16,000 feet of New Track
- Construction of 2 #15 Turnouts
UPRR Inge Siding Project Uvalde, TX Del Rio Sub
- Clearing and Grubbing of 40 Acres
- Excavation and Enhancement of 75,000 cubic yards of soil
- Placement of 30,000 tons of Limestone Base Material
- Construction of 1 Precast Bridge
- Construction of 1 Grade Crossing
- Construction of 15,500 feet of New Track
- Construction of 2 #15 Turnouts
UPRR Dome Siding Project Colorado City, TX
- Feb 2020
- Clearing and Grubbing 11 acres
- Excavation of 12,000 cubic yards of soil
- Placement of 14,500 Tons of Limestone Base Material
- Construction of Large FM Road Grade Crossing
- Construction of 7,400 feet of New Track
2020 Gulf Coast Switching Project - Dayton, TX
- Track Rehabilitation of 20,300 TF
- Re-profiling of 14,400 TF
- Replacement of 6,500 Cross Ties
- Replacement of 650 Switch Ties
- Rail Replacement 3,100 TF
- Surfacing of 26,000 TF
- Placement of 22,000 Tons of Ballast Material
2019 Gulf Coast Switching Project - Dayton, TX
- Track Rehabilitation of 21,250 TF
- Undercutting of 16,075 TF
- Replacement of 4,000 Cross Ties
- Placement of 25,000 Tons of Ballast
- Elimination of 250 Joints
- Install 8,750 feet of Truck Under-drain
Our Mission
Choctaw Construction Services, LLC.
Quick Links
Contact Us
Main Office:
35831 Brumlow Rd.
Hempstead, TX 77445
979-826-0323
info@choctawcs.com
Business Office:
PO Box 187
Katy, TX 77492
info@choctawcs.com
Careers
Join our team!
We are looking for quality individuals to fill available positions.
Click the button below for a listing of job opportunities by company. If you have questions regarding a position or about our hiring process, please fill out the form below.
© 2021, Choctaw Construction Services LLC, all rights reserved